Last Panel Installed at St Joseph’s Hospital in Tampa

After a year of construction activity Building Blocks construction team installed their last GFRC panel at St. Joseph’s Hospital in Tampa.  The project included framed GFRC and permanent formwork GFRC, which can be seen in the “V” column below.  It was a privilege to work with HOK, Walter P Moore, and Robins & Morton.Soffit